You are here

Home » Other News

Other News

-

Tree work scheduled June 26 and 28 on the Capitol Campus

Crews will remove a large blue Atlas cedar tree limb that poses potential safety hazards for pedestrians along Cherry Lane near the northwest corner of the Insurance Building on Wednesday, June 26. 

Sidewalks along the northwest corner of Insurance Building will be closed during the work, and some parking spaces on Cherry Lane will be cordoned off. A small number of parking spaces on the south side of the Winged Victory circle will be cordoned off as a staging area. 

Celebrate the State Surplus Retail Store's Grand Re-opening on June 15

The Washington State Surplus Retail Store in Tumwater is holding a Grand Re-opening on June 15 to showcase improvements to the physical space and to tout the larger variety and quality of items for sale to the public.

The store will be open extended hours from 9 a.m. to 5 p.m. on the 15th.

One-day closure set for June 14

In order to prepare for the event, the store will be closed on June 14.

Capital City Pride Festival to bring estimated 5,000 to Capitol Campus June 23

Capital City Pride Festival to bring estimated 5,000 to Capitol Campus June 23

The Department of Enterprise Services' has issued a permit for the 2019 Capital City Pride Festival on Sunday, June 23.

Festival organizers estimate that 5,000 people will attend the annual event, which could affect traffic and parking on Capitol Campus. The event includes a noon parade from the flag circle lawn near the Legislative Building to Heritage Park, where festival activities are scheduled from 1 to 5 p.m.

Temporary repairs for Pritchard Building ramps will improve safety

Enterprise Services Building & Grounds crews recently patched several cracks in the ramps in front of the Joel M. Pritchard Building on the Capital Campus.

The work will help prevent tripping injuries, and make the ramps more accessible.

The repairs are temporary until capital funding is made available for a permanent repair or complete replacement.
 
 

 

Water leaks in the Plaza Garage are being investigated

Construction crews on the East Plaza are investigating the cause of leaks into the Plaza Garage that began Tuesday, May 14. The source is suspected to be trapped water leaking through conduits exposed during the construction. As crews continue to locate the sources of the water leaks, they will take measures to minimize the impacts to parkers and their vehicles. This may be an ongoing issue as crews continue demolition work this spring.

Puget SoundCorps activities on Capitol Campus next week will help protect water quality in Puget Sound

A Puget SoundCorps crew will remove invasive plant species on the Capitol Campus to help protect Puget Sound water quality April 29 through May 2. 

The crew will remove English ivy and other invasive species that harm trees in forested areas on both East and West Campus.

Celebrate Arbor Day Friday April 26

CAPITOL CAMPUS- A new tree will be planted on the Capitol Campus during an Arbor Day celebration on Friday, April 26. The event will be held between the Capitol and Insurance buildings from 11:45 a.m. to 12:30 p.m.

About the Event

Join Gov. Jay Inslee and Department of Natural Resources State Forester George Geissler, supported by the Department of Enterprise Services for the event and commemorative tree planting. Also hear the Capitol Campus Child Care Center children sing their Arbor Day song. The event will begin with a drum ceremony by the Squaxin Island Tribe.

Tree work scheduled on Capitol Campus April 24

OLYMPIA — Tree work will be performed on Kwanzan cherry trees along both sides of Cherry Lane April 24 beginning at 6:30 a.m.

The Washington State Department of Enterprise Services has contracted with Wolbert’s Plant Care Essentials to spray the trees with a fungicide to prevent brown rot fungus.

No roads or sidewalks will be closed, but the work may impact pedestrian traffic. Pedestrians will be redirected around active spray areas. 

Tree work scheduled on Capitol Campus on Tuesday, April 9, to address winter weather damage

OLYMPIA — Tree pruning will be done at various Capitol Campus locations on Tuesday, April 9, throughout the day.

The Washington State Department of Enterprise Services has contracted with Timm’s Tree Care for the pruning effort, which aims to improve tree health and ensure public safety. The work will include removing branches that were damaged during winter storms.

Tree work scheduled on Capitol Campus Monday, March 18

OLYMPIA — Biofertilizer will be applied to Kwanzan cherry trees along Cherry Lane on West Capitol Campus on Monday, March 18, from 6 to 9 a.m. The work, originally scheduled for February, was postponed due to inclement weather. 

The Washington State Department of Enterprise Services has contracted with Wolbert's Plant Essentials for the work, which aims to improve tree health.

The contractor also will treat the historic Bush butternut tree on West Campus to control butternut blister mites, which are affecting the tree.  

Pages