The following documents are the Department of Enterprise Services' Division 01 DBB basic templates set up with Specifier Notes for the A/E Consultant to use in the preparation of Contract Documents for each Public Works Project Manual. Each Specifier Note (in red) and Example (in blue) is designed to aid the A/E to edit the document as needed to match the project and should be deleted once that section is edited appropriately. Additionally, the header of each document should be edited to include the Client Name and Project Number.

All Bid Docs to be reviewed by DES after October 1, 2022, must have these included.

Document Library

General Questions can be sent to Talia.Baker@des.wa.gov

00 7400 - Special Conditions  
(START HERE)
01 0000 - Design-Bid-Build Division 01 Specification Guidelines - updated 12/20/2022
01 4000 - Quality Requirements
01 1000 - Summary 01 4216 - Definitions
01 1101 - Summary of Hazardous Materials Work 01 5000 - Temporary Facilities and Controls
01 1250 - Site Specific Conditions 01 6000 - Product Requirements
01 2000 - Price and Payment Procedures 01 7000 - Execution Requirements
01 2050 - Contract Modification Procedures - updated 06/13/2023 01 7419 - Construction Waste Management
01 2200 - Unit Prices 01 7800 - Closeout Submittals and Procedures
01 2300 - Alternates 01 9113 - General Commissioning Requirements
01 2500 - Substitution Procedures  
01 3000 - Administrative Requirements updated 06/07/2024 01 Form - Notice of Nonconformance
01 3216 - Construction Progress Schedule - updated 10/10/2023 01 Form - Request For Information (RFI) - updated 04/11/2023
01 3329 - Sustainable Design Reporting - LEED 01 Form - Substitution Request Form (SRF)
01 3553 - DOC - Security Procedures 01 Form - Request for Equitable Adjustment in Contract Time