Design-Build Project Selections

Within RCW 39.10.300, per requirements in RCW 39.10.270, DES has been certified through the project review committee to use the Design-Build procedure, when appropriate. For additional information, please visit the Design-Build and GC/CM Alternate Public Works Page.

This page includes Current Design-Build selections as well as Past Design-Build selections can be found in the table below.

The submissions are public records and will be disclosed. Following the selection completion, the Statement of Qualifications and Proposals will be posted on this webpage.

Public Works Bidding

DES is launching a new bidding portal (Bonfire) that will allow you to submit bids and proposals to DES online and will replace current submission methods. (Oct. 1, 2023 for contractor bidding, early 2024 for all other public works opportunities). Register now, and learn more.

Updated COVID Proclamation Recission

Effective immediately, in response to Governor Inslee’s rescission of the COVID-19 declaration of emergency and all other remaining COVID-19 proclamations, the Department of Enterprise Services (DES) is ending the following COVID-19 requirements:

  • Covid-19 Vaccination Declaration
  • Covid-19 Vaccination Verification Plans

Continue to follow remaining safety regulations from the Department of Labor and Industries and the Department of Health. Be aware that facilities managed or occupied by other organizations may continue to have COVID-19 related restrictions or requirements.

Read the governor’s message for complete details.

Project Name Project Documents/
Addenda
Attachments Due Date/ Selected Team

Design Build Services

Bates Technical College - Fire Services Training Center

Tacoma

DES Project Manager
Essa Ahmed

2023-166 Design-Build RFQ

2023-166 RFQ Addendum 1 - added 5/8/2023

2023-166 Pre-Submission Meeting Presentation + Sign In - added 5/17/2023

2023-166 RFP - added 6/16/2023

2023-166 RFP Addendum 1 - added 6/16/2023

2023-166 RFP Addendum 2 - added 6/28/2023

2023-166 RFP Addendum 3 - added 7/6/2023

Attachment 00 - Designated Point of Contact for Design-Build Team
Attachment 01 - Draft Contract
Attachment 01A - GMP Amendment to the Contract
Attachment 02 - Design-Build General Conditions
Attachment 03 - Attachment B - Scope Design Build Services
Attachment 04 - Draft RFP
Attachment 05 - Owner Project Requirements
Attachment 06 - Owner Program Requirements
Attachment 07 - Not Used
Attachment 08 - Campus/Project Map
Attachment 09 - Not Used
Forms Required with RFP
Attachment 10 - Diverse Business Inclusion Plan
Attachment 11 - Price Factor Form - updated 6/28/2023
Attachment 12 - Confidentiality Certificate

5/25/2023

Apparent Selected Team

BNBuilders + Miller Hull + MW Studios

Scoresheets

Phase 1 and 2 Submittals

Design Build Services

Pierce College - Fort Steilacoom Olympic South Building

Lakewood

DES Project Manager
Dennis Flynn

2021-192 Design Build RFQ

2021-192 Addendum 1 (2.1)

2021-192 Addendum 2

2021-192 RFP - added 10/10/2022

2021-192 Addendum 3 - 10/19/2022

2021-192 Addendum 4 - 10/24/2022

21-192 Addendum 5 - 11/16/2022

Attachment 0 - Designated Point of Contact
Attachment 1 - Contract
Attachment 1A - GMP Amendment to the Contract
Attachment 2 - Design-Build General Conditions
Attachment 2A - Design-Build Supplemental Conditions
Attachment 3 - Attachment B Phase 1 and Phase 2 Scope,
3A Responsibility Matrix, 3B Milestone Delivery, 3C BIM Requirements

Attachment 4 - Draft RFP - added 9/2/2022
Attachment 5 - Owner Project Requirements - added 9/2/2022
Attachment 6 - Owner Program Requirements
Attachment 7 - not used
Attachment 8 - Vicinity Map
Attachment 9 - Good Faith Hazardous Materials Report
Attachment 9A - Olympic South Post Abatement Summary
Forms Required with RFP
Attachment 10 - Diverse Business Inclusion Plan - added 9/2/2022
Attachment 11 - Price Factor Form
Attachment 12 - Confidentiality Certificate - updated 10/24/2022

9/15/2022

Selected Teams

FORMA + McGranahan

Score sheets

Phase 1 and 2 Submittals

Design Build Services

Clark College - Advanced Manufacturing Center Building

Ridgefield

2018-254 Design Build RFQ

2018-254 Info Meeting Presentation

2018-254 Info Meeting Sign-In

2018-254 Info Meeting Chat

2018-254 Addendum 1 - added 10/7/2021

2018-254 RFP - added 11/4/2021

2018-254 Addendum 2 - added 11/18/2021

Attachment 0 - Point of Contact
Attachment 1 - Proposed Contract
Attachment 1a - Proposed GMP Amendment to the Contract
Attachment 2 - General Conditions
Attachment 2a - Design Build Supplemental Conditions
Attachment 3 - Attachment B (Phase 1 and Phase 2 Scope, Responsibility Matrix, Milestone Delivery, BIM Requirements)
Attachment 4 - Draft RFP
Attachment 5 - not used
Attachment 6 - Predesign
Attachment 6b - Geotech Report
Attachment 6c - Site Topographical Map
Attachment 6d - Cultural Resources Survey and DAHP Letter
Attachment 7 - not used
Attachment 8 - Project Site Map
Attachment 9 - Good Faith Hazardous Materials Statement - added 11/4/2021
Forms required with RFP
Attachment 10 - Diverse Business Inclusion Plan - updated 11/4/2021
Attachment 11 - Price Factor Form - updated 11/4/2021
Attachment 12 - Confidentiality Certificate - updated 11/4/2021
Attachment 13 - AMC Business Plan Excerpts - added 11/4/2021
Attachment 14 - Clark College Social Equity Plan - added 11/4/2021

10/12/2021

Successful Team

Mortenson + Hennebery Eddy Architects

Score Sheets

Phase 1 and 2 Submittals

Design Build Services

Washington Center for Deaf and Hard of Hearing Youth - Academic and PE Building

Vancouver

2018-713 Design Build RFQ

2018-713 Addendum 1 - added 7/27/021

2018-713 Addendum 2 - added 8/3/2021

2018-713 RFP - added 9/2/2021

2018-713 Addendum 3 - added 9/7/2021

2018-713 Addendum 4 - added 9/13/2021

2018-713 Addendum 5 - added 9/22/2021

2018-713 Addendum 6 - added 10/4/2021

Info Meeting Chat/Attendance

Attachment 1 - Proposed Contract
Attachment 1a - Proposed GMP Amendment to the Contract
Attachment 2 - General Conditions
Attachment 2a - Design Build Supplemental Conditions
Attachment 3 - Attachment B (Phase 1 and Phase 2 Scope, Responsibility Matrix, Milestone Delivery, BIM Requirements)
Attachment 4 - Draft RFP
Attachment 5 - SEPA Permitting
Attachment 6 - Predesign
Attachment 6b - Geotech Report
Attachment 7 - not used
Attachment 8 - Campus/Project Map
Attachment 9 - not used
Forms required with RFP
Attachment 10 - Diverse Business Inclusion Plan - updated 9/2/2021
Attachment 11 - Price Factor Form - updated 9/2/2021
Attachment 12 - Confidentiality Statement - updated 9/2/2021

8/12/2021

Selected Team

Skanska and Mithun

Score Sheets

Design Build Services

Bellevue College - Center for Transdisciplinary Learning and Innovation (TDI)

Bellevue

2020-016 Design Build RFQ

2020-016 Addendum 1 - added 7/22/2021

2020-016 Addendum 2 - added 8/2/2021

2020-016 Addendum 3 - added 9/3/2021

2020-016 RFP - added 8/26/2021

Info Meeting Attendance List

Info Meeting Presentation

Attachment 1 - Proposed Contract
Attachment 1a - Proposed GMP Amendment to the Contract
Attachment 2 - General Conditions
Attachment 2a - Design Build Supplemental Conditions
Attachment 3 - Attachment B (Phase 1 and Phase 2 Scope, Responsibility Matrix, Milestone Delivery, BIM Requirements)
Attachment 4 - Draft RFP
Attachment 5 - Not Used
Attachment 6 - Bellevue College TDI Pre-Design
Attachment 6c - Site Survey
Attachment 6b - Geotech Report
Attachment 7 - Project Request Report
Attachment 8 - Campus/Project Map
Attachment 9 - Hazmat Report (pending)
Forms required with RFP
Attachment 10 - Diverse Business Inclusion Plan
Attachment 11 - Price Factor Form - updated 8/26/2021
Attachment 12 - Confidentiality Statement - updated 8/26/2021

8/5/2021

Selected Team

Clark Construction and LMN Architects

Score Sheets

Design Build Services

Pierce College STEM Building

Puyallup

2020-148 Design Build RFQ

Addendum 1 - 5/24/2021

Addendum 2 - 5/28/2021

Addendum 3 - 6/3/2021

Addendum 4 - 7/20/2021

2020-148 RFP - 6/29/2021

Pre-Submission Presentation (Amended)

Pre-Submission Meeting Attendance List (from Zoom Chat)

Attachment 1 - Proposed Contract
Attachment 1a - Proposed GMP Amendment to the Contract
Attachment 2 - General Conditions
Attachment 2a - Design Build Supplemental - Conditions
Attachment 3 - Attachment B (Phase 1 and Phase 2 Scope)
Attachment 4 - Draft RFP
Attachment 5 - Not Used
Attachment 6 - Pierce College, Puyallup STEM Pre-Design, ORP, DAHP Letter, Nisqually Indian Tribe and Puyallup Tribe of Indians Communication
Attachment 6b - Geotech Report
Attachment 7 - Project Request Report
Attachment 8 - Campus/Project Map
Attachment 9 - Not Used
Forms required with RFP
Attachment 10 - Diverse Business Inclusion Plan
Attachment 11 - Price Factor Form
Attachment 12 - Confidentiality Statement

6/10/2021

Selected Team

Absher + Integrus

Score Sheets - added 8/16/2021

Contact us

Angel (Ernst) Butros